City of Coral Gables building permits
City of Coral Gables issues its own building permits. Their folio numbers start with 03.
Last checked September 22, 2026
How a permit moves through City of Coral Gables
Where the application starts
Online portalThe downloadable application is submitted electronically, including signatures. The City’s per-scope requirements document names the permit type to apply for on each of its 38 sections — for a kitchen or bathroom remodel, “FBC Residential — Interior Build-Out/Remodel” or, commercially, “FBC Building (Commercial) — Interior Build-Out/Interior Alteration”.
Open Coral Gables permitsSource: City of Coral Gables — Permit Requirements for Development Services (11 Aug 2026) · checked September 22, 2026
Where plans and documents go
Online portalDrawings are uploaded to the City’s EnerGov permit and follow the Electronic Submittal Guide, which sets the trusted agencies for digital signatures, the required permit forms and the sheet naming convention per discipline. The PDF is digitally signed on its FIRST PAGE, per Florida Rule 61G1 for registered architects and 61G15 for professional engineers; each discipline is a separate PDF named by discipline alone — the City says “Do not add addresses or version numbers” and “Do not add sheet numbers or additional text”.
Open Coral Gables EnerGov self-serviceSource: City of Coral Gables — Electronic Submittal Guide · checked September 22, 2026
Status and corrections
Online portalA correction is answered from inside the permit: “There will be a ‘Resubmit’ button under the document that is being requested to upload… This will take you to the Corrections wizard.” The City keeps the paper convention electronically — the design professional stamps the superseded sheet VOID and inserts the new sheet in front of it, and the WHOLE discipline is resubmitted as one PDF each time, revised sheets before void sheets, with a narrative for the corrections and bubbled revisions.
Open Coral Gables EnerGov self-serviceSource: City of Coral Gables — Electronic Submittal Guide · checked September 22, 2026
What City of Coral Gables asks for
City of Coral Gables publishes submittal requirements for these 35 permit types:
- New construction additions alterations
- Antennas
- Awnings canopies
- Bathroom kitchen flooring ceilings
- Trellis pergolas
- Decks
- Partial demolition
- Total demolition
- Docks moorings wharves
- Doors skylights windows storefronts
- Driveways pavers tiling walkways
- Generator lp tank gas meter
- Exterior cbs wall
- Fence
- Temporary construction fence
- Painting residential exterior
- Painting commercial exterior
- Landscaping
- Outdoor seating
- Sidewalk cafe
- Poles
- Railings guardrails ironworks
- Roof
- Screen enclosures
- Shutters louvers security bars
- Signs
- Solar
- Pools spas fountains ponds
- Pool resurfacing
- Irrigation
- Parking lot resurfacing
- Shop drawing submittals
- Temporary trailer
- Sales centre trailer
- Building recertification
- City of Coral Gables — Permit Requirements for Development Services (11 Aug 2026) · read September 22, 2026
- City of Coral Gables — Commonly Requested Corrections (Dec 2025) · read September 22, 2026
- City of Coral Gables — Building Permit Exemptions & Design Signature Requirements (5/2022) · read September 22, 2026
Fees
No published fee schedule found; ask City of Coral Gables for an estimate.
Fees are paid to City of Coral Gables through Coral Gables EnerGov self-service — Pay Invoice.
Official forms
2 forms from City of Coral Gables’s own forms index. MiamiPermitAI can fill all of them from your project details.
City of Coral Gables building, trade and miscellaneous permits.
rev. 7/24/2023
- Change of Contractor, Architect, or EngineerWe fill this
Changing the contractor, architect or engineer on a permit.
County reviews may also apply: County guide.
Contact
- Office
- City of Coral Gables Development Services
- Phone
- 305-446-6800
- DevelopmentServices@coralgables.com
- Address
- 234 Minorca Ave, Coral Gables, FL 33134
Source: City of Coral Gables — Development Services contacts · checked September 22, 2026
Get a City of Coral Gables permit package ready before you file
Not affiliated with City of Coral Gables; we don’t submit permits. Confirm before you file. Out of date? Tell us.