Town of Medley building permits

Town of Medley issues its own building permits. Their folio numbers start with 22.

Last checked September 22, 2026

How a permit moves through Town of Medley

Where the application starts

Online portal

The Town runs its permitting on BS&A Online, whose Medley services list opens with “Apply for a Permit” alongside “Apply for a Planning, Zoning or Engineering Process”. The exception is a right-of-way permit, which the Town’s own checklist says “must be submitted electronically via email to BUILDING@TOWNOFMEDLEY.COM”.

Open Town of Medley — BS&A Online

Source: Town of Medley — BS&A Online services · checked September 22, 2026

Where plans and documents go

More than one way

Two sets of plans, per the Town’s notice to applicants. A right-of-way package goes by e-mail to the Building Department; a TCO/TCC package is delivered as a physical binder — the Town’s wording is “You must submit the required documents in a binder to the Building Dept”, divided with sheet protectors.

Open Town of Medley — BS&A Online

Source: Town of Medley — Right of Way Application Submittal Checklist · checked September 22, 2026

Status and corrections

Online portal

Records are searched and inspections requested on BS&A Online; the Town adds that if the system is down the inspection request may be e-mailed to building@townofmedley.com or phoned in, 24 hours in advance. Inspections run by trade on fixed days — building Tuesday to Thursday, roofing Tuesday and Thursday, electrical Tuesday and Wednesday, plumbing and mechanical Tuesday and Thursday — and a zoning final is requested by e-mail.

Open Town of Medley — Schedule an Inspection (BS&A Online)

Source: Town of Medley — Building and Zoning Department · checked September 22, 2026

What Town of Medley asks for

Town of Medley publishes submittal requirements for these 20 permit types:

  • Fences walls
  • Window door
  • Decks patios
  • Screen enclosures hurricane shutters
  • Pre fab sheds gazebos
  • Carports garages room enclosures
  • Interior alterations
  • Additions barns stables storage
  • Paving
  • Drainage well
  • Retention swale
  • Iron bars
  • New construction
  • Satellite dish
  • Slab driveways
  • Lot clearing
  • Fill
  • Signs
  • Certificate of occupancy
  • Right of way

Fees

Town of Medley’s fee schedule: Town of Medley — Building & Zoning Licensing Department Fee Schedule, effective The cover reads “Effective Date 07-06-2026” (Issued for the Building, Zoning & Engineering Departments; the Town’s link text says the changes were adopted 07-06-26).

Charged on top: A Town surcharge, a scanning service fee, a double fee, an early-start fee and interest on unpaid amounts are each their own section; Fees based on estimated cost have their own documentation-requirements section.

Fees are paid to Town of Medley through Town of Medley — Pay a Building Department Fee (BS&A Online).

Official forms

2 forms from Town of Medley’s own forms index. MiamiPermitAI can fill all of them from your project details.

County reviews may also apply: County guide.

Contact

Office
Town of Medley Building and Zoning Department
Phone
305-887-6913
Email
building@townofmedley.com
Address
7777 NW 72nd Avenue, Medley, FL 33166
Hours
Monday–Wednesday 7 a.m.–5 p.m.; Thursday 7 a.m.–4:30 p.m.; closed Friday

Source: Town of Medley — Building and Zoning Department · checked September 22, 2026